Bathroom Remodel Contractors Near Me

Licensed local bathroom remodeler for San Marino homes

Bathroom remodel contractors near me San Marino CA

When you search for bathroom remodel contractors near me San Marino CA, you want a crew that shows up on time, pulls the right permits, and leaves a bathroom you actually want to use. We handle full gut renovations, tub-to-shower conversions, and vanity upgrades across San Marino and Los Angeles County. Call (626) 876-0879 for a same-day estimate.

Live phone supportUpfront optionsBacked workmanship
Call firstLive triage can help before arrival
Safety before speedRisks assessed before work begins
Diagnose the causeWe trace the source, not just the symptom
Approve the workScope and price explained upfront

What's included

What our bathroom remodel service includes

Every bathroom remodel we quote is a fixed-scope package. Below is what is standard on a full gut. Add-ons like heated floors, curbless showers, and custom glass are priced separately so you can see exactly what each upgrade costs before you commit.

01

Demo and haul-away

We remove the old tub, tile, vanity, toilet, and drywall, protect your floors and stairs, and haul everything to the dump. Debris does not sit in your driveway overnight. Most bathrooms demo in a single day.

02

Plumbing and electrical rough-in

New supply lines, drain, and venting where needed, plus GFCI outlets, a dedicated bathroom circuit, and a vent fan sized for the room. All rough-in is inspected before the walls close. We replace galvanized pipe when we find it.

03

Waterproofing and tile

Cement board, taped seams, and a bonded waterproof membrane with a flood test. Then floor and wall tile set with a laser level, grouted, and sealed. Niche, bench, and curb details are mitred, not trimmed with plastic.

04

Vanity, toilet, and fixtures

Installation of the vanity, countertop, sink, faucet, toilet, shower valve, and trim. We test every connection and run the shower for 20 minutes before we call the job done. You supply the fixtures or we order them at trade pricing.

05

Paint, trim, and final clean

Bathroom-rated paint on walls and ceiling, new baseboard and door casing, and a full clean of the room and the path we used. You walk in to a finished bathroom, not a construction site.

06

Permit and inspection management

We pull the permit, meet the inspector at every stage, and hand you the final sign-off paperwork with your warranty. That documentation matters when you sell the house and the buyer's agent asks for permits.

Service overview

Bathroom remodel contractors near me San Marino CA

Bathroom remodel contractors near me San Marino CA is the licensed trade category that handles demolition, framing, plumbing rough-in, waterproofing, tile, electrical, and finish carpentry inside a residential bathroom. A full remodel typically runs 3 to 6 weeks depending on scope. We tear out the old tub, rebuild the wet wall with cement board and a bonded waterproof membrane, set tile with a laser level for consistent grout lines, and finish with a new vanity, toilet, and fixtures that meet California Building Code (CBC) requirements.

San Marino homes - especially the 1920s to 1950s builds around Lacy Park and St. Albans Road - often hide original cast iron drains, galvanized supply lines, and subfloor water damage behind the tile. A local bathroom remodeler San Marino homeowners trust will open the wall, replace what is failing, and document the fix before closing it back up. If you have been searching for a nearby bathroom remodel contractor San Marino residents can call on short notice, we keep two crews dedicated to Los Angeles County jobs.

Code-correct from day oneEvery rough-in we do is inspected against the California Building Code (CBC) and IBC standards. That means proper venting, GFCI protection within 6 feet of the tub, and a waterproof membrane that passes a flood test before tile goes down. You get a final inspection sign-off, not a callback in two years.
Permits handled for youSan Marino requires permits for any bathroom that moves plumbing, adds electrical, or changes structural framing. We pull the permit, schedule the inspections, and meet the inspector on site. Permit delays are the number one cause of blown timelines, and we plan around them from week one.
Realistic 2026 timelinesA standard hall bath takes 3 to 4 weeks. A primary bath with a curbless shower and heated floor runs 5 to 6 weeks. We give you a written day-by-day schedule before demo starts, and we hold to it. If you need a bathroom back before a holiday, tell us at the estimate.
CoreNexus Works serving San Marino, California
How we workWe verify the cause, compare realistic options, and confirm the repair before we leave.

The service timeline

How our bathroom remodel process works

The process flexes to the condition, but these checkpoints keep decisions clear.

01

On-site estimate

We walk the bathroom with you, measure the footprint, check the drain and supply lines, and look for signs of past water damage. You get a written scope and price within 24 hours. Most estimates take 45 minutes. We do not charge for the visit and we do not upsell you into a full gut if a targeted fix will do.

Stage 1
02

Design and permits

You pick tile, vanity, fixtures, and layout. We draw the plan, submit the permit application to the city, and order materials so nothing sits in a warehouse for three weeks. This stage runs 5 to 10 business days depending on how fast the plan check clears.

Stage 2
03

Demo and rough-in

We protect the hallway and stairs with rosin paper and plastic, then demo the bathroom in one day. The plumber and electrician rough in new lines, we frame any changes, and the inspector signs off before anything gets closed up. This is where we find the surprises - rotted subfloor, cracked cast iron, missing venting.

Stage 3
04

Waterproof and tile

Cement board goes up, seams get taped and mudded, and the waterproof membrane gets a flood test. Once it passes, we set tile with a laser level, grout, and seal. Niche and bench details get mitred edges, not plastic trim. This stage is the longest - usually 8 to 12 working days.

Stage 4
05

Fixtures and walkthrough

Vanity, toilet, shower glass, mirrors, and lighting go in. We test every fixture, run the shower for 20 minutes, and check for leaks at every joint. You walk the room with us, we fix anything on your punch list, and we hand over warranty paperwork. Final payment is due only after you sign off.

Stage 5

Tools & methods

Tools and methods we use

Purpose-built equipment, used by trained technicians, so the job is done accurately the first time.

01

DeWalt and Milwaukee cordless drills

Driving cement board screws, setting blocking, and installing vanity hardware. Cordless keeps the hallway clear of cords and trip hazards.

02

Makita circular saw with a diamond blade

Cutting cement board and tile backer cleanly. A diamond blade gives a straight edge without chipping the board, which matters at every seam.

03

Bosch laser level

Setting the first course of wall tile and keeping grout lines level across a 6-foot wall. A laser beats a bubble level on long runs.

04

Stanley tape measure and framing square

Layout for the vanity, toilet rough-in, and shower valve height. Accurate layout is what keeps the finished room symmetrical.

05

Nail gun and hammer

Framing changes, blocking for grab bars and glass panels, and securing the subfloor before tile goes down.

06

Concrete mixer

Mixing deck mud for a sloped shower pan or patching a slab where a drain line was moved.

Use cases

When to call a bathroom remodeler

These examples show how the service framework adapts rather than forcing every call through one repair.

Bathroom Remodel Contractors Near Me
1948 hall bath gut in Lacy ParkOriginal cast iron drain with a slow blockage, a flexing subfloor near the toilet, and green drywall behind the shower tile. The homeowner had patched the ceiling below twice in three years. → Full gut to the studs, new ABS drain, new subfloor, cement board with a bonded membrane, and a 24-hour flood test that passed. New tile, vanity, and toilet. Project finished in 19 working days.

Tub-to-shower conversion in Mission District

A 5-foot tub that the owner could no longer step into safely. The bathroom was small, dark, and had a single vanity with no storage. → Curbless shower with a linear drain, blocking for future grab bars, a wall-hung vanity that opened up the floor, and a new LED light and vent fan. Finished in 4 weeks with a first-pass inspection.

Emergency rebuild in San Marino Heights

A supply line burst on a Sunday night and flooded the bathroom and hallway. Standing water, soaked vanity, and a ceiling stain in the room below. → Same-night shutoff and water extraction, drying equipment set for 4 days, then a full rebuild with matched tile and a new vanity. The ceiling below was repaired and painted. Total rebuild time: 3 weeks.

Problems we solve

Bathroom problems we fix in San Marino

Most bathroom remodels start because something is already failing. Here are the four issues we see most often in San Marino homes, and what happens if you leave them alone.

ISSUE

Water damage behind the shower wall

We demo the affected wall, treat or replace the framing, replace the subfloor, and rebuild with cement board and a bonded waterproof membrane. The flood test confirms the fix before tile goes back up.

SYMPTOM

Original cast iron drain lines

We scope the drain during the estimate. If the line is failing, we replace it with ABS or PVC during the rough-in stage, while the floor is open. Doing it later means tearing out the new tile.

SIGN

Failed or missing waterproofing

We strip the old assembly, install cement board, and apply a bonded sheet or liquid membrane. A 24-hour flood test proves it holds before we set a single tile. This is the step cheap bids skip.

ALERT

Permit delays and code violations

We pull the permit, build the schedule around plan-check timelines, and meet the inspector at every stage. You get final sign-off paperwork, which is what a buyer's agent will ask for.

Pricing process

Bathroom remodel pricing in San Marino

$18,000 - $85,000 depending on scope

Phase 01

Layout changes

Moving the toilet, sink, or shower drain means cutting the slab or rerouting under the floor. That adds plumbing labor and a longer inspection cycle. Keeping the layout saves $3,000 to $8,000 on a typical job.

Phase 02

Tile selection

Ceramic starts around $3 per square foot. Porcelain, natural stone, and large-format tile run $8 to $25 per square foot installed. A full bathroom uses 80 to 120 square feet of wall and floor tile.

Phase 03

Waterproofing scope

A standard tub surround needs less membrane than a full curbless shower with a bench and niche. The membrane and flood test add $800 to $2,500 depending on the wet area size.

Questions before we arrive

Frequently asked questions

Bathroom Remodel Contractors Near Me
Call (626) 876-0879
Who is the best bathroom remodel contractor near me in San Marino CA?

The best contractor is the one who pulls the permit, shows you the license, and finishes on schedule. Ask three questions: Are you licensed through the CSLB? Can I see two recent San Marino jobs? Who is my daily point of contact? We answer all three in writing with the estimate. Call (626) 876-0879 and we will walk you through our last three projects in Los Angeles County.

How much does a bathroom remodel contractor near me cost in San Marino California?

Typical 2026 pricing in San Marino runs $18,000 to $35,000 for a hall bath and $45,000 to $85,000 for a primary bath with a curbless shower and heated floor. Cost drivers are tile selection, whether plumbing moves, and how much rot we find behind the walls. We give you a fixed written price before demo, so the number does not move unless you change the scope.

How do I find a licensed bathroom remodeler near me in San Marino?

Check the license number on the CSLB website, confirm the business address is local, and ask for a certificate of insurance before work starts. A licensed local bathroom remodeler near me San Marino California search should return a contractor who can name the inspector assigned to your ZIP code. We serve 91108 and 91118 and know the San Marino plan-check process cold.

Is there a 24/7 bathroom remodel contractor near me in San Marino CA?

Yes. We answer emergency calls around the clock for active leaks, sewage backups, and storm damage that floods a bathroom. Call (626) 876-0879 any hour. We can shut off the water, extract standing water, and set drying equipment the same night, then schedule the rebuild once the room is dry. Non-emergency estimates are booked within 48 hours.

Ready when you are

Get a bathroom remodel contractors near me San Marino CA estimate

One call, one visit, one written price. We are licensed through the CSLB, bonded and insured, and we have been remodeling San Marino bathrooms since 2023. Call (626) 876-0879 today and we will book your on-site estimate within 48 hours.

Bathroom Remodel Contractors Near Me

Talk with the local team

Request Bathroom Remodel Contractors Near Me

Call (626) 876-0879 during business hours and you will reach a person, not a voicemail tree. We return every call the same day and schedule walkthroughs within the week. For water damage or storm emergencies, we keep a line open after hours.

2481 Mission St, Suite B, San Marino, CA 91108 United States, San Marino, CaliforniaMain office · technicians serve the full area

Thanks — your request is in. We will contact you shortly.

Call now